Recirculated air systems for Donauisar Klinikum Deggendorf

|   Air filter technology

Final assembly and commission scheduled for July 2020…

Marchhart is currently installing three recirculated air systems with 12 HEPA filter outlets including thermal insulation in the central sterilisation department of the Donauisar Klinikums Deggendorf hospital. The small recirculated air wall modules are the special feature of this project – these modules will be installed with dry cooling and maximum cooling load of 3.8kW/module.

Project launch was in mid-April 2019, the initial assembly of the recirculated air wall modules took place in early August 2019; final installation and commissioning are scheduled for July 2020.