Technical masterpiece in additional two operating theatres in France

|   Air filter technology

Two more operating theatres in the Centre hospitalier de Dreux are ready for use.

The Centre hospitalier de Dreux hospital in France continues to focus on technological innovations, renovation of existing facilities and construction of new operating theatres. The operating theatres No. 5 and 6 have been now upgraded to ISO 5
To this end Marchhart installed LAF ceilings with horizontal filtering layer and LED RGBW bar backlighting, four recirculated air wall modules with cooler, two control cabinets and four clean room air extraction cabinets. The high technical requirements were cleanly and efficiently addressed through individual solutions in line with the state-of-the-art approach.

Technical key data:
Completion: October 2019

Equipment:
Operating theatre No. 5 and 6 ISO 5-compliant with LAF ceilings (laminar air flow) with horizontal filtering layer and constructionally centred three-point mounting for two structurally supported outlets. 
With RGBW LED bar backlighting.
Four recirculated air wall modules, each with cooler incl. temperature control unit for cooling water; two modules for wall installation, two modules free standing.
Two control cabinets for recirculated air modules.
Four clean room air extraction cabinets.
Touch displays in the operating theatre.

Go to the FAQ page for more details on LAF ceilings >>